Building Blocks Furniture Evidence for Irish Childcare

Furniture lists, capacity-honest drawings and indoor/outdoor splits that Irish services can attach to a Project Execution Plan — without West Shore writing the grant application.

  • The application stays with the service (Hive / Pobal / DCDE). We do not write the PEP, submit it, or promise an award.
  • We produce a furniture annex: room-by-room quantities, a drawing that matches place counts, and indoor versus outdoor lines.
  • Recent Building Blocks rounds prioritise extra full-time places for 1–3 year olds (pre-ECCE). Capital rules often treat fixtures and fit-out differently from loose toys and consumables.
  • Read the current scheme notes: Pobal Building Blocks Capital Programmes y Building Blocks Extension Scheme Phase 2.

For Core Funding partner services adding 1–3 full-time places — extensions, modular rooms or a new Irish classroom — and for sessional services moving into full-day. Quoted for delivery across Ireland.

Evidence an Irish furniture file usually needs

Capacity-honest layout

Place counts must survive clear-floor maths after furniture is placed. A drawing that shows 14 toddlers in a room that only nets 10 will stall a PEP as fast as a missing quote.

Build on childcare fit-out Ireland

1–3 full-time room list

That is the age band recent capital rounds have targeted. Sleep, changing, low storage and child-sized seating for 1–3 belong on their own room sheet, not mixed into an ECCE pack.

Specify on crèche furniture Ireland y kindergarten furniture Ireland

Fixtures versus movable

Fixed storage, changing, sleep furniture and UDG items often sit in the capital conversation. Loose parts, toys and consumables usually stay on an operator-funded column. We split the quote so the PEP is not carrying a toy shop.

Keep toys on educational toys Ireland as a separate line

Indoor versus outdoor split

Do not bury a garden in a single classroom lump sum. Irish files read faster when the room and the yard are separate schedules.

Yard list on outdoor play equipment Ireland

UDG and AIM extras

Extensions are commonly asked to follow Universal Design Guidelines. Inclusion / AIM pieces should be listed, not hidden inside “misc furniture”.

Show them on childcare fit-out Ireland

PEP annex pack

A plan, piece counts, and two columns: proposed capital fixtures versus operator-funded movable. Your design team pastes that into the PEP. West Shore does not file the Hive form.

Start from childcare fit-out Ireland

What usually delays an Irish furniture grant file

Lump-sum quotes

One number for “classroom furniture” cannot be checked against a room or an eligible-cost heading.

Drawings that do not match

The PEP place count, the Tusla-conscious net area and the furniture list have to describe the same Irish room.

Toys inside capital

Recent purchasing and construction notes have treated movable furniture, toys and consumables as outside typical capital eligibility. Split them before the file goes in.

Windows, match-funding and Core Funding rules change by round. Do not treat a closed 2025 date as a live opening. Check the current Pobal / DCDE communique.

What to send so we can build the annex

A floor plan (PDF or a dimensioned photo), the age mix, how many extra full-time 1–3 places you are creating, and whether the garden is in scope. We return an Ireland delivery quote with capital-candidate fixtures and operator-funded movable items in separate columns.

Inspection language for the same rooms sits on the Tusla-conscious furniture guide.

Preguntas frecuentes

Do you write the PEP or submit the Building Blocks application?

No. The service owns the Hive / Pobal file. We supply a furniture and layout annex your design team can attach.

Will tables and chairs automatically qualify for Building Blocks?

Not automatically. Current rounds often fund fixtures and fit-out that create extra 1–3 full-time places. Movable items may sit outside capital. We split the list; the scheme rules decide eligibility.

Why do you keep mentioning 1–3 year olds?

That is the undersupplied full-time cohort recent Irish capital rounds have prioritised. Other ages can sit on the same project once the minimum 1–3 increment is met — check the current table.

Is this only for Core Funding partner services?

Recent extension rounds have been. Treat that as a live rule, not a permanent one, and confirm on the Pobal page before you plan the file.

How is this different from the Tusla page?

Tusla is the inspection room. This page is the capital evidence pack. Irish extensions usually need both.

What do you need from us to quote?

Plan, ages, extra full-time 1–3 places, indoor/outdoor scope. We quote delivery across Ireland and mark what is typically capital versus operator-funded.

Related Ireland childcare pages

Ask for a grant-readable annex: fixtures versus operator-funded movable. We do not file the application or promise an award.

Request an Ireland furniture annex

Sources: Pobal Building Blocks Capital Programmes and DCDE Phase 2 notes. Eligibility and windows change — check the current circular.

catalogue2026

¡Solicite el catálogo preescolar ahora!

Llene el siguiente formulario y nos pondremos en contacto con usted dentro de 24 horas.

¡Consigue gratis servicios de diseño de guarderías y mobiliario a medida! ¡Actúe ya!

¡Rellena el formulario ahora y te contactaremos en menos de 24 horas! ¡Aprovecha la oportunidad, no te la pierdas!

Póngase en contacto

Rellene el siguiente formulario y nuestro equipo estará encantado de atenderle

Descubra un mobiliario excepcional para su espacio educativo.

Transformar los espacios de aprendizaje